![Bureau of Public Debt 2](https://skaengineers.com/wp-content/uploads/2023/10/Hinge-Website_Bureau-of-Public-Debt-2-1440x723.jpg)
![Bureau of Public Debt 1](https://skaengineers.com/wp-content/uploads/2023/10/Hinge-Website_Bureau-of-Public-Debt-1-1440x630.jpg)
![Bureau of Public Debt 3](https://skaengineers.com/wp-content/uploads/2023/10/Hinge-Website_Bureau-of-Public-Debt-3-1440x630.jpg)
Bureau of Public Debt
This new headquarters facility for the Bureau of Public Debt, a division of the US Treasury Department, was delivered in two phases. Phase I is a five-story building and was designed to accommodate future expansion projects and Phase II consists of a four-story building. The building façades complement the surrounding historic architecture of the existing community through the use of brick cladding, metal paneling, and glass.
Unique structural security features include designs to meet Federal progressive collapse mitigation and blast-resistant design criteria. The project achieved a LEED Certified rating for sustainable buildings.
Project Details
CLIENT
Lowe Enterprises, Studios Architecture
Location
PARKERSBURG, WV
Market
Services
Square Footage
189,000
Year Completed
2005
Related Projects
![Pike & Rose 2](https://skaengineers.com/wp-content/uploads/2023/09/Hinge-Website_Project-Images_Pike-Rose-2-768x473.jpg)
Pike & Rose
NORTH BETHESDA, MD
![Tysons II-1](https://skaengineers.com/wp-content/uploads/2023/08/Hinge-Website_Project-Images_Tysons-II-1-768x336.jpg)
The Corporate Office Centre at Tysons II
TYSONS CORNER, VA
![20 Mass 1](https://skaengineers.com/wp-content/uploads/2023/11/Hinge-Website_20-Mass-1-768x514.jpg)
20 Mass
WASHINGTON, DC
![Crystal Park 4 Garage 1](https://skaengineers.com/wp-content/uploads/2023/08/Hinge-Website_Project-Images_Crystal-Park-4-Garage-1-768x336.jpg)
Crystal Park Complex
Garage Repairs
ARLINGTON, VA
![DC DGS HQ 1](https://skaengineers.com/wp-content/uploads/2023/11/Hinge-Website_DC-DGS-HQ-1.jpg)
DC DGS Headquarters
WASHINGTON, DC
![Max Robinson Center 1](https://skaengineers.com/wp-content/uploads/2023/11/Hinge-Website_Max-Robinson-Center-1-768x462.jpg)
Max Robinson Center
WASHINGTON, DC
![WETA HQ 2](https://skaengineers.com/wp-content/uploads/2023/12/Hinge-Website_Project-Images_WETA-HQ-2.jpg)
WETA Headquarters
ARLINGTON, VA
![Wharf Parcels 6&7_1](https://skaengineers.com/wp-content/uploads/2023/08/Hinge-Website_Project-Images_Wharf-Parcels-67_1-768x336.jpg)
670 and 680 Maine
WASHINGTON, DC
![Eight Tower Bidge Roof 1](https://skaengineers.com/wp-content/uploads/2023/08/Hinge-Website_Project-Images_Eight-Tower-Bidge-Roof-1-768x336.jpg)
Eight Tower Bridge
Roof Replacement
CONSHOHOCKEN, PA