NEWS + INSIGHTS
Project Updates
Ribbon Cutting for Garfield Elementary School
Project Updates
DCHA HQ Transformed Into High-Rise Apartments
Awards
The Wren Wins Washingtonian Magazine Award
Awards
Canal Center Plaza Wins Beautification Award
Upcoming Event
Webinar: Passive House Design Considerations and Lessons Identified
In the News
PBS News Hour – Aired from New Studio at WETA HQ
BY THE NUMBERS
805
MILLION + SQUARE FEET ENGINEERED
1960
THE YEAR WE BECAME A BUSINESS
41
REGISTERED ENGINEERS ON STAFF
25
STATES WE'RE LICENSED IN
OUR PROJECTS
Max Robinson Center
Washington, DC
The new Max Robinson Center is a 120,000 sf, six-story medical office building with one level of below grade parking totaling 26,000 sf. The building is located on Parcel 17 of the St. Elizabeths East mixed-use redevelopment, which includes over five million square feet of housing, retail, hotel, cultural, and office space situated over multiple parcels.
Philip's Academy
Paterson, NJ
The new 63,000 sf building enables Philip’s Academy to operate a single campus for 675 students from kindergarten through eighth grade.
Carroll County Career & Technology Center
Westminster, MD
A specialized vocational high school, with over 850 students and 23 career-oriented programs. The project includes 108,000 sf of new construction and 83,000 sf of renovation.
Bethesda Place Plaza Renovation
Bethesda, MD
The Bethesda Place plaza had deteriorated and outdated finishes in need of revitalization and the various water leaks that affected the garage below prompted a full-fledged plaza renovation project.
20 Mass
Washington, DC
Building upon the existing nine-story structure, the new 20 Mass building features three levels of vertical expansion and one bay of horizontal expansion.
NoMaCNTR
Washington, DC
Located on the former site of a Greyhound bus terminal, the NoMaCNTR development features a new 13-story, 876,000 sf mixed-use building with a 235-room hotel and a residential component with 472 total units.
Hart Auditorium Renovation
Washington, DC
Located in Georgetown University's Law Center, the 291-seat auditorium underwent a renovation program to update the facility’s lobby areas, reconfigure seating, and provide new AV and lighting systems.
The Claude
Chevy Chase, MD
The Claude is a 12-story residential building on the south end of the Chevy Chase Lake development featuring ground floor retail and roof terraces.
Bard High School
Washington, DC
The new 115,000 sf facility was delivered under two phases and included the renovation of a portion of the existing facility and construction of a new addition.
Westchester Rockville Station Apartments
Rockville, MD
The apartments' breezeway repairs involved the reconstruction of a four-story wood-framed walkway, initially compromised due to poor original waterproofing detailing and installation.
DC DGS Headquarters
Washington, DC
The new 258,000 sf facility features four levels of office space, ground floor retail, a penthouse, a rooftop terrace, and a below grade parking level.
National Landing Experience Center
Arlington, VA
The renovation of the National Landing Marketing Center required changing the use of the 6,200 sf space from business to assembly occupancy, which involved significant architectural and structural upgrades.
Vela Connector Bridge
Washington, DC
An 11-story residential building with 379 apartments along with 16,000 sf of retail and co-working spaces. Spanning over one hundred feet, a specialized bridge structure supports the building’s primary amenity spaces for its tenants.
Chemonics Headquarters
Washington, DC
The new Chemonics International headquarters is housed in an 11-story, Class “A” office building at The Yards mixed-use development.
Crystal Park Complex Garage Repairs
Arlington, VA
A comprehensive garage restoration program was designed, bid on, and executed with the work completed in phases while the buildings remained occupied and the garages partially open for use.