16th Street, NW, Bridge Over Military Road
SK&A field technicians performed pull-off testing services in accordance with the project specifications and ASTM C1583 for the reconstruction of the 16th Street, NW, bridge over Military Road. The tensile capacity of the concrete substrate after the surface preparation was also verified. Once the overlay material was installed and adequately cured, it was inspected and tested to verify conformance with the accepted application procedures.
A visual inspection was performed in conjunction with the bond strength testing. Pull-off adhesion testing was used to determine the bond strength between the substrate and the overlay material. A field technician was also provided to obtain test specimens in accordance with ASTM C42, and laboratory personnel to test the specimens in accordance with ASTM C39, to determine the compressive strength of in-place concrete. The test specimens were obtained due to low strength test results of the in-place concrete during construction of the structure. Additionally, penetration resistance was performed on the hardened concrete barrier, to estimate the in-place strength in accordance with ASTM C803.
Project Details
CLIENT
Transwestern
Location
WASHINGTON, DC
Services
Year Completed
2015